SPEC Ltd News

News Archive


Speak To Us Today

01924 871 558

Email Us

enquiries@spec-ltd.com


SPEC OXFORD NEWS

Freedom Group - LUL Neasden

June 2015

Working closely with the Freedom Group and London Underground on the fit out of a new 132kV - 22kV switch-room, SPEC are carrying out the installation of all building services to include all lighting, small power, heating and ventilation utilising heavy duty galvanised steel cable trunking and conduits.

We are also supplying and installing a network of heavy duty cable ladders and trays to which all interlink control and SCADA cabling will be installed. SPEC will then carry out all final connections and testing to BS7671.

SPEC will also assist with all final commissioning prior to completion and handover.

« Back to all News stories


In The News

SPEC Power the Olympics

When the time came for main contractor Morrison Construction / Galliford Try appoint a contractor to install…

SPEC power the Olympics

Case Studies

RAF Marham, Norfolk

Working for our client, Turner Facilities Management, SPEC are installing nearly 3KM of new High Voltage distribution at RAF Marham…

Image

  • Registered Office
  • Unit 5 Eagle Point
  • Telford Way
  • Wakefield 41 Industrial Estate
  • Wakefield
  • WF2 OXW
template="/