Pump Contract

SPEC has been awarded the contract of upgrading the electrical support systems for a major fire pump which is used in the instance of a fire emergency on a large site.

SPEC Ltd primarily put together the full detailed design for client approval, this included all cable calculations, cable schedules, duct schedules, equipment schedules and termination diagrams. SPEC also carried out partial design and procurement of the dual VSD motor control centre and kiosk enclosure. As part of the contract SPEC will be assisting the client in the FAT of the back-up generator system, alterations to the existing control MCC and undertaking the full electrical installation, testing and commissioning.